Texas Instruments TPS7H4104EVM Evaluation Module

Texas Instruments TPS7H4104EVM Evaluation Module helps designers evaluate the operation and performance of the TPS7H4104. The TPS7H4104 is a 7V, 3A per channel, multichannel, peak-current mode, synchronous buck converter optimized for use in area-sensitive, space environment applications.

The TI TPS7H4104EVM Evaluation Module arranges each converter separately so the board has a 0.8V, 1.2V, 1.5V, and 1.8V output.

Features

  • Up to 3A (nominal) of maximum output current per channel
  • Accurate voltage reference of 599.44mV ±1% over line, temperature, and TID
  • Each channel is operated 90 degrees out of phase at the same switching frequency

Applications

  • Space satellite point of supply
  • Satellite electrical power systems (EPS)
  • Radiation-hardened power supplies

Layout

Location Circuit - Texas Instruments TPS7H4104EVM Evaluation Module
Published: 2025-05-30 | Updated: 2025-06-12