|
|
EEPROM 256K FAST PROG SDP - 150NS
- AT28C256F-15UM/883
- Microchip Technology
-
20:
2.234,72 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-A28C256F15UM883
|
Microchip Technology
|
EEPROM 256K FAST PROG SDP - 150NS
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 20
Mult.: 20
|
|
|
|
|
EEPROM 150NS CERDIP
- AT28C256E-15DM/883-815
- Microchip Technology
-
14:
1.662,31 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-C256E15DM883815
|
Microchip Technology
|
EEPROM 150NS CERDIP
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 14
Mult.: 14
|
|
|
|
|
EEPROM 200NS CERDIP
- AT28C256E-20DM/883-815
- Microchip Technology
-
14:
1.716,77 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-C256E20DM883815
|
Microchip Technology
|
EEPROM 200NS CERDIP
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 14
Mult.: 14
|
|
|
|
|
EEPROM 150NS CERDIP
- AT28C256F-15DM/883-815
- Microchip Technology
-
14:
1.755,79 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-C256F15DM883815
|
Microchip Technology
|
EEPROM 150NS CERDIP
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 14
Mult.: 14
|
|
|
|
|
SRAM ASYNC
- CY7C1011G30-10BAJXET
- Infineon Technologies
-
1:
81,31 kr.
-
Non-Stocked Lead-Time 26 Weeks
|
Mouser Part No
727-CY7C1011G30AJXET
|
Infineon Technologies
|
SRAM ASYNC
|
|
Non-Stocked Lead-Time 26 Weeks
|
|
Min.: 1
Mult.: 1
:
2.000
|
|
|
|
|
SRAM ASYNC
- CY7C1011G30-10BAJXE
- Infineon Technologies
-
4.800:
66,02 kr.
-
Non-Stocked Lead-Time 26 Weeks
|
Mouser Part No
727-CY7C1011G30BAJXE
|
Infineon Technologies
|
SRAM ASYNC
|
|
Non-Stocked Lead-Time 26 Weeks
|
|
Min.: 4.800
Mult.: 4.800
|
|
|
|
|
SRAM ASYNC
- CY7C1011G30-12ZSXE
- Infineon Technologies
-
1:
73,63 kr.
-
Non-Stocked Lead-Time 26 Weeks
|
Mouser Part No
727-CY7C1011G30ZSXE
|
Infineon Technologies
|
SRAM ASYNC
|
|
Non-Stocked Lead-Time 26 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
SRAM ASYNC
- CY7C1011G30-12ZSXET
- Infineon Technologies
-
1.000:
60,28 kr.
-
Non-Stocked Lead-Time 26 Weeks
|
Mouser Part No
727-CY7C1011G30ZSXET
|
Infineon Technologies
|
SRAM ASYNC
|
|
Non-Stocked Lead-Time 26 Weeks
|
|
Min.: 1.000
Mult.: 1.000
:
1.000
|
|
|
|
|
Monostable Multi-vibrator X34 Monostable Multi-vibrator Multivibrator VCC: 2-5.5V
- TC74VHC221AFK(EL,K
- Toshiba
-
1:
4,17 kr.
-
Non-Stocked Lead-Time 16 Weeks
|
Mouser Part No
757-TC74VHC221AFKELK
|
Toshiba
|
Monostable Multi-vibrator X34 Monostable Multi-vibrator Multivibrator VCC: 2-5.5V
|
|
Non-Stocked Lead-Time 16 Weeks
|
|
Min.: 1
Mult.: 1
:
2.500
|
|
|
|
|
LED Lighting Driver ICs 3PH BOOST CONTROLLER SPI GRESHAM
- NCV78703MW1AR2G
- onsemi
-
2.500:
13,58 kr.
-
Non-Stocked Lead-Time 52 Weeks
-
New Product
|
Mouser Part No
863-NCV78703MW1AR2G
New Product
|
onsemi
|
LED Lighting Driver ICs 3PH BOOST CONTROLLER SPI GRESHAM
|
|
Non-Stocked Lead-Time 52 Weeks
|
|
Min.: 2.500
Mult.: 2.500
:
2.500
|
|
|
|
|
LED Lighting Driver ICs 60V, 1.1A, Synchronous Step-Down LED Driver with PWM and Analog Dimming Function
- MP24881GN-P
- Monolithic Power Systems (MPS)
-
1:
17,68 kr.
-
Non-Stocked Lead-Time 64 Weeks
-
New Product
|
Mouser Part No
946-MP24881GN-P
New Product
|
Monolithic Power Systems (MPS)
|
LED Lighting Driver ICs 60V, 1.1A, Synchronous Step-Down LED Driver with PWM and Analog Dimming Function
|
|
Non-Stocked Lead-Time 64 Weeks
|
|
Min.: 1
Mult.: 1
:
500
|
|
|
|
|
EEPROM 256K 11MIL GRIND - 200NS
- AT28C256-20FM/883
- Microchip Technology
-
15:
1.580,18 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-A28C25620FM883
|
Microchip Technology
|
EEPROM 256K 11MIL GRIND - 200NS
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 15
Mult.: 15
|
No
|
|
|
|
EEPROM 256K 11MIL GRIND - 250NS
- AT28C256-25FM/883
- Microchip Technology
-
15:
1.483,64 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-A28C25625FM883
|
Microchip Technology
|
EEPROM 256K 11MIL GRIND - 250NS
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 15
Mult.: 15
|
No
|
|
|
|
EEPROM 256K HI-ENDURANCE SDP - 150NS
- AT28C256E-15FM/883
- Microchip Technology
-
15:
1.614,19 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-A28C256E15FM883
|
Microchip Technology
|
EEPROM 256K HI-ENDURANCE SDP - 150NS
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 15
Mult.: 15
|
No
|
|
|
|
EEPROM 256K HI-ENDURANCE SDP - 200NS
- AT28C256E-20FM/883
- Microchip Technology
-
15:
1.677,75 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-A28C256E20FM883
|
Microchip Technology
|
EEPROM 256K HI-ENDURANCE SDP - 200NS
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 15
Mult.: 15
|
No
|
|
|
|
EEPROM 256K HI-ENDURANCE SDP - 250NS
- AT28C256E-25FM/883
- Microchip Technology
-
15:
1.677,75 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-A28C256E25FM883
|
Microchip Technology
|
EEPROM 256K HI-ENDURANCE SDP - 250NS
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 15
Mult.: 15
|
No
|
|
|
|
EEPROM 256K FAST PROG SDP - 150NS
- AT28C256F-15DM/883
- Microchip Technology
-
14:
1.656,49 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-A28C256F15DM883
|
Microchip Technology
|
EEPROM 256K FAST PROG SDP - 150NS
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 14
Mult.: 14
|
No
|
|
|
|
EEPROM 256K FAST PROG SDP - 150NS
- AT28C256F-15FM/883
- Microchip Technology
-
15:
1.611,96 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-A28C256F15FM883
|
Microchip Technology
|
EEPROM 256K FAST PROG SDP - 150NS
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 15
Mult.: 15
|
No
|
|
|
|
EEPROM 256K 11MIL GRIND - 150NS
- AT28C256-15FM/883
- Microchip Technology
-
1:
1.609,12 kr.
-
Non-Stocked Lead-Time 23 Weeks
|
Mouser Part No
556-AT28C25615FM883
|
Microchip Technology
|
EEPROM 256K 11MIL GRIND - 150NS
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 1
Mult.: 1
|
No
|
|
|
|
Latches LOG CMOS LATCH OCTAL 3ST
- MC74ACT573DWR2G-Q
- onsemi
-
1.000:
2,26 kr.
-
Non-Stocked Lead-Time 15 Weeks
-
Factory Special Order
|
Mouser Part No
863-C74ACT573DWR2G-Q
Factory Special Order
|
onsemi
|
Latches LOG CMOS LATCH OCTAL 3ST
|
|
Non-Stocked Lead-Time 15 Weeks
|
|
Min.: 1.000
Mult.: 1.000
:
1.000
|
|
|
|
|
SRAM 4Mb,High-Speed,Async,256K x 16,10ns,5v,44 Pin TSOP II, RoHS
- IS61C25616AL-10TLI-TR
- ISSI
-
1.000:
41,48 kr.
-
Non-Stocked Lead-Time 12 Weeks
|
Mouser Part No
870-61C25616AL10TLIT
|
ISSI
|
SRAM 4Mb,High-Speed,Async,256K x 16,10ns,5v,44 Pin TSOP II, RoHS
|
|
Non-Stocked Lead-Time 12 Weeks
|
|
Min.: 1.000
Mult.: 1.000
:
1.000
|
|
|
|
|
SRAM 4Mb,High-Speed,Async,512K x 8,10ns,5v,44 Pin TSOP II, RoHS
- IS61C5128AL-10TLI-TR
- ISSI
-
1.000:
37,23 kr.
-
Non-Stocked Lead-Time 12 Weeks
|
Mouser Part No
870-61C5128AL-10TLIT
|
ISSI
|
SRAM 4Mb,High-Speed,Async,512K x 8,10ns,5v,44 Pin TSOP II, RoHS
|
|
Non-Stocked Lead-Time 12 Weeks
|
|
Min.: 1.000
Mult.: 1.000
:
1.000
|
|
|
|
|
SRAM 8Mb,High-Speed/Low Power,Async with ECC,1Mb x 8,10ns,2.4V-3.6V,48 Ball mBGA (6x8 mm), RoHS
- IS61WV10248EDBLL-10BLI-TR
- ISSI
-
2.500:
87,73 kr.
-
Non-Stocked Lead-Time 12 Weeks
|
Mouser Part No
870-61WV10DBLL10BLIT
|
ISSI
|
SRAM 8Mb,High-Speed/Low Power,Async with ECC,1Mb x 8,10ns,2.4V-3.6V,48 Ball mBGA (6x8 mm), RoHS
|
|
Non-Stocked Lead-Time 12 Weeks
|
|
Min.: 2.500
Mult.: 2.500
:
2.500
|
|
|
|
|
SRAM 8Mb,High-Speed/Low Power,Async with ECC,1Mb x 8,10ns,2.4V-3.6V,44 Pin TSOP II, RoHS
- IS61WV10248EDBLL-10TLI-TR
- ISSI
-
1.000:
87,73 kr.
-
Non-Stocked Lead-Time 12 Weeks
|
Mouser Part No
870-61WV1EDBLL10TLIR
|
ISSI
|
SRAM 8Mb,High-Speed/Low Power,Async with ECC,1Mb x 8,10ns,2.4V-3.6V,44 Pin TSOP II, RoHS
|
|
Non-Stocked Lead-Time 12 Weeks
|
|
Min.: 1.000
Mult.: 1.000
:
1.000
|
|
|
|
|
SRAM 2Mb,High-Speed,Async,128K x 16,8ns/3.3v, or 10ns/2.4v-3.6v,48 Ball mBGA (6x8 mm), RoHS, Automotive temp, ECC
- IS64WV12816EDBLL-10BLA3-TR
- ISSI
-
2.500:
64,38 kr.
-
Non-Stocked Lead-Time 12 Weeks
|
Mouser Part No
870-6412816EDBL1BL3T
|
ISSI
|
SRAM 2Mb,High-Speed,Async,128K x 16,8ns/3.3v, or 10ns/2.4v-3.6v,48 Ball mBGA (6x8 mm), RoHS, Automotive temp, ECC
|
|
Non-Stocked Lead-Time 12 Weeks
|
|
Min.: 2.500
Mult.: 2.500
:
2.500
|
|
|