2-,3-, & 4-Wheeler Light Electric Vehicles

Melexis 2-,3-, and 4-Wheeler Light Electric Vehicles application provides a solution from battery management constraints (sufficient power, longevity, and safety) to drive train efficiency and personalization. Battery and management are the key differentiators in this increasingly complex world of e-vehicles. Discover Melexis products for user applications, including current sensors, position sensors, latch and switch, and tire pressure monitoring sensors. 

Results: 508
Select Image Part # Mfr. Description Datasheet Availability Pricing (DKK) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire latch IMC Bop/Brp: pre-Progr Latch TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 8 Weeks
Reel
2,28 kr.
Min.: 10.000
Mult.: 10.000
: 10.000
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire Lach IMC Bop/Brp: pre-Progr TC = pre-Progr Vdd= 2.7 - 24V Non-Stocked Lead-Time 2 Weeks
4,42 kr.
3,87 kr.
3,42 kr.
3,27 kr.
Min.: 1
Mult.: 1
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire latch Bop/Brp: +-3mT TC = -1100 Vdd= 2.7 - 24V Non-Stocked Lead-Time 8 Weeks
6,03 kr.
5,07 kr.
4,71 kr.
3,97 kr.
Reel
2,44 kr.
Min.: 1
Mult.: 1
: 7.500
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire latch Bop/Brp: +-3mT TC = -1100 Vdd= 2.7 - 24V Non-Stocked Lead-Time 8 Weeks
Reel
2,43 kr.
Min.: 3.500
Mult.: 3.500
: 3.500
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire latch Bop/Brp: +-3mT TC = -1100 Vdd= 2.7 - 24V Non-Stocked Lead-Time 2 Weeks
4,24 kr.
3,69 kr.
3,26 kr.
3,10 kr.
Min.: 1
Mult.: 1
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire latch Bop/Brp: +-3mT TC = -1100 Vdd= 2.7 - 24V Non-Stocked Lead-Time 2 Weeks
4,62 kr.
3,92 kr.
3,63 kr.
3,06 kr.
Min.: 1
Mult.: 1
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire latch Bop/Brp: pre-Progr Latch TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 8 Weeks
2,33 kr.
Min.: 5.000
Mult.: 5.000
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire latch Bop/Brp: pre-Progr Latch TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 2 Weeks
5,45 kr.
4,59 kr.
4,26 kr.
3,60 kr.
Min.: 1
Mult.: 1
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire latch Bop/Brp: pre-Progr Latch TC = pre-Progr Vdd= 2.7 - 24V Non-Stocked Lead-Time 2 Weeks
4,42 kr.
3,86 kr.
3,42 kr.
3,25 kr.
Min.: 1
Mult.: 1
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire latch Bop/Brp: +-2mT TC = 0 Vdd= 2.5-5.5
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 12 Weeks
Cut Tape
3,85 kr.
3,20 kr.
2,97 kr.
2,50 kr.
Reel
1,60 kr.
Min.: 1
Mult.: 1
: 10.000
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire latch Bop/Brp: +-2mT TC = 0 Vdd= 2.5-5.5
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 2 Weeks
3,78 kr.
3,19 kr.
2,96 kr.
2,50 kr.
Min.: 1
Mult.: 1
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire switch Bop/Brp: +-2mT TC = 0 Vdd= 2.5-5.5
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 2 Weeks
3,78 kr.
3,19 kr.
2,96 kr.
2,50 kr.
Min.: 1
Mult.: 1

Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire Latch Bop/Brp: +-10mT TC = -2000 Vdd= 2.5-5.5 Non-Stocked Lead-Time 12 Weeks
Reel
1,45 kr.
Min.: 10.000
Mult.: 10.000
: 10.000

Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire Latch Bop/Brp: +-10mT TC = -2000 Vdd= 2.5-5.5 Non-Stocked Lead-Time 2 Weeks
3,78 kr.
3,19 kr.
2,96 kr.
2,50 kr.
1,68 kr.
Min.: 1
Mult.: 1
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire switch Bop/Brp: pre-Progr TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 8 Weeks
Reel
2,36 kr.
Min.: 10.000
Mult.: 10.000
: 10.000
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire switch Bop/Brp: pre-Progr TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 8 Weeks
Reel
2,36 kr.
Min.: 10.000
Mult.: 10.000
: 10.000
Melexis Board Mount Hall Effect/Magnetic Sensors Bop/Brp: pre-Progr switch TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 8 Weeks
Reel
2,36 kr.
Min.: 10.000
Mult.: 10.000
: 10.000
Melexis Board Mount Hall Effect/Magnetic Sensors Bop/Brp: pre-Progr switch TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 2 Weeks
5,71 kr.
4,81 kr.
4,47 kr.
3,77 kr.
Min.: 1
Mult.: 1
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire switch Bop/Brp: pre-Progr TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 2 Weeks
5,71 kr.
4,81 kr.
4,47 kr.
3,77 kr.
Min.: 1
Mult.: 1
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire switch Bop/Brp: pre-Progr TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 2 Weeks
5,71 kr.
4,81 kr.
4,47 kr.
3,77 kr.
Min.: 1
Mult.: 1
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire switch Bop/Brp: pre-Progr TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 8 Weeks
Reel
2,36 kr.
Min.: 10.000
Mult.: 10.000
: 10.000
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire switch Bop/Brp: pre-Progr TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 8 Weeks
Reel
2,36 kr.
Min.: 10.000
Mult.: 10.000
: 10.000
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire switch Bop/Brp: pre-Progr TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 2 Weeks
5,71 kr.
4,81 kr.
4,47 kr.
3,77 kr.
Min.: 1
Mult.: 1
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire switch Bop/Brp: pre-Progr TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 8 Weeks
Reel
2,36 kr.
Min.: 10.000
Mult.: 10.000
: 10.000
Melexis Board Mount Hall Effect/Magnetic Sensors 3-wire switch Bop/Brp: pre-Progr TC = pre-Progr Vdd= 2.7 - 24V
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 2 Weeks
5,71 kr.
4,81 kr.
4,47 kr.
3,77 kr.
Min.: 1
Mult.: 1