IMC Technology Sensors & Switches

Melexis IMC Technology Sensors and Switches measure up to three magnetic flux components in a single integrated circuit. IMC Technology identifies the three basic components of the magnetic field and creates a highly accurate and stable picture of where the corresponding magnetic source is in 3D space. This technology can be used to determine the rotary angle, linear distance, joystick position, proximity sensing, and current sensing. 

Results: 490
Select Image Part # Mfr. Description Datasheet Availability Pricing (DKK) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Melexis Board Mount Current Sensors Gen2 HiSpeed Conv.Hall Prog.Curr.Sens Ana 8.78mV/mT Non-Stocked Lead-Time 16 Weeks
Reel
14,47 kr.
Min.: 3.500
Mult.: 3.500
: 3.500
Melexis Board Mount Current Sensors Gen2 HiSpeed Conv.Hall Prog.Curr.Sens Ana 15mV/mT TF-VA-S-2.54-7.35 Non-Stocked Lead-Time 16 Weeks
Reel
15,96 kr.
Min.: 2.000
Mult.: 2.000
: 2.000
Melexis Board Mount Current Sensors Gen2 HiSpeed Conv.Hall Prog.Curr.Sens Ana 50mV/mT TF-VA-S-2-10.42 Non-Stocked Lead-Time 16 Weeks
15,89 kr.
Min.: 3.000
Mult.: 3.000
Melexis Board Mount Current Sensors Gen2 HiSpeed Conv.Hall Prog.Curr.Sens Ana 15mV/mT TF-VA-S-2-10.42 Non-Stocked Lead-Time 16 Weeks
15,89 kr.
Min.: 3.000
Mult.: 3.000
Melexis Board Mount Current Sensors Gen2 HiSpeed Conv.Hall Prog.Curr.Sens Ana 15mV/mT TF-VA-S-2-10.42 Non-Stocked Lead-Time 16 Weeks
Reel
17,16 kr.
16,86 kr.
16,49 kr.
Min.: 500
Mult.: 500
: 500
Melexis Board Mount Current Sensors Gen2 HiSpeed Conv.Hall Prog.Curr.Sens Ana 15mV/mT STD2 Non-Stocked Lead-Time 16 Weeks
Reel
15,82 kr.
Min.: 3.500
Mult.: 3.500
: 3.500
Melexis Board Mount Current Sensors Gen2 HiSpeed Conv.Hall Prog.Curr.Sens Ana 19mV/mT STD2 Non-Stocked Lead-Time 16 Weeks
Reel
17,16 kr.
16,86 kr.
16,49 kr.
Min.: 500
Mult.: 500
: 500
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 100mV/mT (50-300)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
18,13 kr.
17,75 kr.
Min.: 1.040
Mult.: 80
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 40mV/mT (30-200)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
17,68 kr.
16,93 kr.
Min.: 1.040
Mult.: 80
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 60mV/mT (30-200)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
Reel
17,38 kr.
Min.: 3.000
Mult.: 3.000
: 3.000
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 60mV/mT (30-200)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
18,13 kr.
17,75 kr.
Min.: 1.040
Mult.: 80
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 30mV/mT (30-200)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
Cut Tape
36,63 kr.
30,88 kr.
28,65 kr.
26,04 kr.
Reel
17,38 kr.
Min.: 1
Mult.: 1
: 3.000
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 30mV/mT (30-200)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
18,13 kr.
17,75 kr.
Min.: 1.040
Mult.: 80
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 25mV/mT (20-125)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
Reel
17,38 kr.
Min.: 3.000
Mult.: 3.000
: 3.000
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 25mV/mT (20-125)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
18,13 kr.
17,75 kr.
Min.: 1.040
Mult.: 80
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 30mV/mT (20-125)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
Reel
17,38 kr.
Min.: 3.000
Mult.: 3.000
: 3.000
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 30mV/mT (20-125)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
18,13 kr.
17,75 kr.
Min.: 1.040
Mult.: 80
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 20mV/mT (20-125)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
Reel
17,38 kr.
Min.: 3.000
Mult.: 3.000
: 3.000
Melexis Board Mount Current Sensors Gen2.5 HiSpeed IMC.Hall Prog.Curr.Sens Ana 20mV/mT (20-125)
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 16 Weeks
18,13 kr.
17,75 kr.
Min.: 1.040
Mult.: 80
Melexis Board Mount Current Sensors Gen2.5 HiSpeed Conv.Hall Prog.Curr.Sens Ana 15mV/mT
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 19 Weeks
13,73 kr.
Min.: 5.000
Mult.: 5.000
Melexis Board Mount Current Sensors Gen2.5 HiSpeed Conv.Hall Prog.Curr.Sens Ana 15mV/mT
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 20 Weeks
Reel
14,40 kr.
Min.: 3.500
Mult.: 3.500
: 3.500
Melexis Board Mount Current Sensors Gen2.5 HiSpeed Conv.Hall Prog.Curr.Sens Ana 17mV/mT posTC
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 19 Weeks
14,47 kr.
Min.: 5.000
Mult.: 5.000
Melexis Board Mount Current Sensors Gen2.5 HiSpeed Conv.Hall Prog.Curr.Sens Ana 17mV/mT posTC
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 20 Weeks
Reel
15,14 kr.
Min.: 3.500
Mult.: 3.500
: 3.500
Melexis Board Mount Current Sensors Gen2.5 HiSpeed Conv.Hall Prog.Curr.Sens Ana 13mV/mT
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 19 Weeks
14,47 kr.
Min.: 5.000
Mult.: 5.000
Melexis Board Mount Current Sensors Gen2.5 HiSpeed Conv.Hall Prog.Curr.Sens Ana 13mV/mT
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 20 Weeks
Reel
15,14 kr.
Min.: 3.500
Mult.: 3.500
: 3.500